What does it cost to open a small hotel? A line-by-line budget for an existing building
Opening a small hotel in an existing building requires a line-by-line budget, not a single figure. This guide breaks down conversion costs, per-room equipment, and working capital to help you calculate a realistic payback.
Contents
Key takeaways
- A construction cost per square meter prices a new shell, not a conversion, so it cannot answer a budget question about a building that already stands.
- The opening budget has four blocks: the building, the conversion, the per-room set, and everything paid before the first guest plus the cash that carries the first season.
- Rent and payroll run during the fit-out months, so the length of the works is itself a cost line.
- Every line should carry a quote source and a date, because a total assembled from memory cannot be defended to a bank, a partner or yourself.
- The total is only useful when it is divided by the annual cash the hotel is expected to keep, which gives the payback you actually want to know.
There is no single figure. Opening a small hotel in an existing building is a sum of separate lines: deposit and rent during the fit-out, conversion work, furniture and equipment per room, fire and certification work, systems, opening stock and working capital for the first months. Build the total from your own quotes, not from a cost per square meter.
You have found the building: a few floors, a courtyard, a price you can just about carry. The first question from the bank, your family or your partner is the one you typed into a search box: how much does it cost to open a small hotel? The honest answer is a table, not a number. This article builds that table line by line, so you can fill it from real quotes and see the payback at the end.
Why is there no single figure for the cost to open a small hotel?
Because in an existing building the cost is not a rate applied to a surface, it is a set of decisions about what the building already has and what must be added. Two buildings of the same size can differ by multiples, and neither is wrong.
A cost per square meter comes from new construction: shell, structure, roof, facade. It says nothing about whether the rooms already have bathrooms, whether the electrical panel can carry air conditioning, or whether a fire escape exists. For a fuller picture of what official construction figures do and do not cover, see reading the official unit-cost table for hotel construction in Türkiye.
The biggest single variable in a conversion is the wet core. Moving or adding a bathroom per room means plumbing, waterproofing, tiling and ventilation, and it is the line that most often breaks a first budget. The second variable is services capacity: electrical supply, hot water, heating and cooling, and the ventilation a kitchen needs. Upgrading a supply connection is slow and is priced by others, not by your contractor.
The third is the fire and life-safety package: detection, escape routes, signage, and the works those require. It is a design question before it is a price question.
What to ask for instead of a rate: an itemized quote per work package, a per-room-type price for furniture and equipment, and a separate per-unit price for each bathroom. Then compare quotes line by line, not on the total.
Write every line as one-time or recurring. Deposit, conversion and furniture are one-time. Rent, payroll, utilities and systems subscriptions are recurring and start before revenue does.
Watch outA rate is not a budget
A per-square-meter figure from a contractor's brochure or a listing usually excludes bathrooms, mechanical and electrical upgrades, fire works, furniture, kitchen equipment, professional fees and the rent you pay while the works run. Treat any such figure as a starting question to a contractor, never as a total.
What does the building cost before any fit-out work starts?
Either a purchase price with its transaction costs, or a lease with a deposit, advance rent and a rent bill that starts on day one of the fit-out. Both belong in the opening budget, and they are usually the two largest lines.
If you buy: the price, plus the title deed fee, the valuation report the bank will ask for, and the professional fees for the legal check on the title and any encumbrance. If you lease: the deposit, usually expressed in months of rent and held for the life of the lease, plus any advance rent. Both are cash out at signature even when the deposit comes back later.
Rent during the fit-out is a real cost line. Every month between taking the keys and taking the first booking is rent and payroll with no room revenue against it. Where a lease is transferred from a previous operator, a transfer premium may be asked. Decide what it buys: a fitted interior, a licence history, furniture, or simply the right to the location.
Check before signing that the lease permits lodging use, that the building's permitted use matches what you intend, and who pays for structural works and for the permits. Take the lease to a lawyer; this article does not replace that. The lease type also changes the economics: for the differences, see an ordinary lease, a hasılat kirası or a management agreement.
ChecklistBuilding cost checklist
- Purchase price and deed fee, or lease deposit in months of rent
- Valuation report and legal check on the title
- Advance rent, if any
- Rent during every fit-out month
- Transfer premium, if any
- Who pays structural works and permits
- Confirmation that lodging use is permitted
- Insurance from the day keys are handed over
What conversion work does a construction figure leave out?
Almost everything a guest touches. A construction figure prices the shell; a conversion prices the inside of it, and that is where the money goes in an existing building.
Start with the wet cores: bathrooms per room, waterproofing, drainage falls, ventilation. Price per bathroom unit, then multiply, then add the rooms where the drain position forces a raised floor or a pumped waste solution. Electrical comes next: the incoming supply capacity, the distribution panel, circuits per room, and the load that air conditioning and a kitchen add. Ask the network operator early; an upgrade has its own timeline and its own invoice.
Then mechanical: heating, cooling, hot water production and storage, and ventilation for kitchens, bathrooms and any windowless space. Sound insulation between rooms, and from corridors and lifts, is cheap while walls are open and expensive to add after the first complaint. Fire and life safety, detection, alarm, escape routes, fire-rated doors, signage and lighting, is designed first and priced second.
Circulation and access matter too: lift, stairs, accessibility, luggage movement, and the back-of-house route for linen, waste and deliveries that keeps guests and staff apart. Kitchen, breakfast area, laundry, storage, staff areas, exterior, signage and landscaping each form a work package with its own quote, and each is routinely missing from a headline rate.
| Work package | What drives the price | What to ask the contractor |
|---|---|---|
| Bathrooms and wet cores | Drain position, waterproofing, ventilation | Is the price per bathroom unit, including tiling? |
| Electrical supply and distribution | Incoming capacity, panel, circuits per room | Is the supply upgrade inside your scope or mine? |
| Heating, cooling and hot water | Plant size, storage, distribution runs | What load calculation is this sized from? |
| Sound insulation | Wall build-ups, floor treatment, lift proximity | What performance does this achieve, measured how? |
| Fire detection and escape routes | Detector count, fire-rated doors, signage | Which parts need a separate designer or approver? |
| Lift and accessibility | Shaft works, machine choice, door widths | Is the shaft work in your price or a separate package? |
| Kitchen and breakfast area | Extraction, gas or electric, finishes | Does this include extraction to the roof? |
| Laundry | Equipment, drainage, ventilation, floor loading | Is equipment installation and commissioning included? |
| Exterior, signage and landscaping | Facade condition, permissions for signage | Which signage needs a separate permit? |
How much does it cost to furnish and equip each room?
Price the room, not the hotel. A room set quoted per room type, multiplied by the number of rooms of that type, gives a number you can check against a supplier and defend later.
Write the room set once: bed and base, mattress and protector, bedside tables, wardrobe, desk or table, chair, mirror, lighting, curtains and blackout, safe, minibar or kettle, television, hair dryer, bathroom fittings and accessories, door hardware, signage and the artwork. Then count the par stock. Linen and towels need enough sets to cover the laundry cycle, plus the stained and the worn. A hotel with one set per room is buying replacements in month two.
Separate furniture and equipment from operating supplies: the bed is capital, the amenities are stock. They are bought differently, depreciated differently and funded differently. Ask each supplier for delivery, installation, warranty and the spare-parts position. A price that excludes installation is not the price.
Compare at least three quotes per package and record the date and validity on each. A quote that expires during your fit-out is a budget error waiting to happen. VAT, customs duty and any import cost on imported items belong in the line, not in a footnote. Confirm the treatment with your accountant before you commit to a supplier.
ChecklistRoom set checklist, filled once per room type
- Bed base and mattress
- Mattress protector and pillow protectors
- Linen sets per bed, plus par stock
- Towel sets, plus par stock
- Bathroom fittings and accessories
- Wardrobe and hangers
- Desk, chair and lighting
- Curtains and blackout
- Safe
- Minibar or kettle
- Television
- Hair dryer
- Door hardware
- Room signage
- Artwork
- Spares and a small maintenance stock
What has to be paid before the first guest arrives?
People, systems, permissions and stock. None of them produce revenue on the day they are paid for, and all of them are needed on the day the first guest arrives.
Pre-opening payroll is the first: the team is hired and trained before opening, and the front desk, housekeeping and kitchen leads are usually the earliest and longest-running lines. Training days and trial stays, running the hotel with staff in role before paying guests arrive, are a cost, and cheaper than learning in front of a review.
Systems come next: a property management system, a channel connection to the booking sites, a point of sale for the restaurant or bar, accounting, and the compliance setup for guest identity notification and electronic invoicing. Price the setup, the subscription and the training separately. Permissions and inspections carry fees, professional support and, often, small works that follow an inspection. This article does not list the legal steps; confirm your own case with a licensed adviser.
Opening stock covers linen, amenities, cleaning chemicals, food and beverage for the first weeks, printed material, and the small tools that keep a building running. Market entry covers photography, a website, the booking-site listings, and the rate and content work that has to be finished before the first rate can be sold. For a fuller treatment of these lines, see the pre-opening budget lines to plan before the first guest.
NoteEvery lira before the first booking
The pre-opening period is the only part of the budget where every lira is spent before a single booking exists. Plan it as a dated list of hires, installations and inspections, then attach a cost and an owner to each date. A line without a date is a wish.
How much cash should be set aside for the first season?
Enough to run the hotel through the months when costs arrive and revenue does not. That is a separate number from the opening budget, and it is the one that decides whether the hotel survives its first year.
A budget is a plan; cash is a calendar. List the months, put the expected collections in one column and the payroll, rent, suppliers and taxes in another, and find the lowest point. In a seasonal hotel the lowest point is usually just before the season starts, when stock and payroll are already committed and the first guests have not yet paid. For how to build that calendar, see planning the months between seasons for a seasonal hotel.
The first season carries costs that later seasons do not: staff learning the building, no repeat guests, no reviews, and suppliers who have not yet extended terms. Set a contingency line and decide in advance which conditions release it. A contingency that can be spent on anything is not a contingency, it is a second budget.
Keep the opening budget and the working-capital line apart in the table. Mixing them hides the fact that working capital is spent and recovered, while fit-out money is spent and depreciated.
Key pointUndercapitalised, not overbuilt
A hotel that opens undercapitalised does not fail because the fit-out cost too much. It fails because the cash ran out in the month before the season, when the building was finished and the rooms were still empty.
How do you fill in the table and turn the total into a payback figure?
Fill it bottom-up from quotes, then divide the total by the annual cash the hotel is expected to keep. That division, not the total, is the number a partner or a bank will ask you for.
Record for every line: the source of the quote, its date, whether it is one-time or recurring, and the amount in one currency. Convert at a stated rate and write the rate down. Add the lines you cannot quote yet as estimates with a name beside them, so that the gaps are visible instead of being absorbed silently into a round total.
Separate the property from the operating business. If you buy the building, the payback of the operating business and the return on the property are two different sums and should not be merged. For the payback, take the annual cash the hotel keeps after operating costs, rent, payroll and tax, and divide the opening total by it. Use your own revenue assumption, and test it at a lower occupancy than you hope for.
If the total exceeds the cash you can raise, the answer is scope, not optimism: fewer rooms in phase one, a simpler bathroom solution, furniture bought for the rooms that open first. Once the hotel is open, the same discipline moves to the operating side: cost per occupied room, line by line tells you whether the budget you built is holding.
| Line | Quote source and date | One-time or recurring | Amount |
|---|---|---|---|
| Purchase price, or lease deposit and advance rent | One-time | ||
| Rent during fit-out | Recurring | ||
| Conversion work package: bathrooms | One-time | ||
| Conversion work package: electrical | One-time | ||
| Conversion work package: mechanical | One-time | ||
| Conversion work package: fire and life safety | One-time | ||
| Conversion work package: other packages | One-time | ||
| Furniture and equipment, per room type | One-time | ||
| Operating equipment and opening stock | One-time | ||
| Systems, setup and training | Recurring | ||
| Permissions, inspections, professional fees | One-time | ||
| Pre-opening payroll and training | Recurring | ||
| Market entry: photography, website, listings | One-time | ||
| Contingency | One-time | ||
| Working capital for the first season | Recovered | ||
| Total, split into property, one-time opening and working capital |
What to do next
Open a spreadsheet with the rows above and start attaching quotes, dates and names to them. The building, the conversion, the room set, the pre-opening period and the first season's cash are five separate sums, and only when all five are written down can you divide by the annual cash the hotel is expected to keep and see whether the project works for you.
Frequently asked questions
How much does it cost to open a 10-room hotel?
There is no honest single figure, and anyone who gives one without seeing the building is guessing. The total depends on whether the rooms already have bathrooms, whether the electrical supply can carry cooling, what the fire works require, and how long the fit-out runs while rent is paid. The answer is a table built from quotes, not a rate per room.
Can I open a small hotel in a leased building?
Yes, subject to the lease permitting lodging use and to the licensing path for the building. The lease adds its own cost lines: deposit, advance rent, and rent during every month of the fit-out. Have the lease and the permitted use checked by a lawyer before signature; this is not a decision to take from an article.
What is most often forgotten in a hotel opening budget?
Rent and payroll during the fit-out months, the par stock of linen and towels that the laundry cycle requires, utility connection and deposit costs, pre-opening training, photography and booking-site setup, and the working capital that carries the months before the season starts. Each is small on its own and material together.
Does the length of the fit-out change the budget?
Yes, directly. Rent, payroll, insurance and some subscriptions run whether or not the works are finished, so every extra month is a cost with no revenue against it. That is why the works programme belongs inside the budget, not only inside the contractor's schedule.
Should the building purchase be part of the opening budget?
Keep it in the table but report it separately. The property is one investment and the operating business is another, with different payback sums and different risks. Merging them makes a weak operating case look acceptable because the building is expected to appreciate.