Key takeaways
- The Regulation on the Qualifications of Tourism Facilities, as amended by Presidential Decree No. 1134 (Official Gazette 1 June 2019, No. 30791), requires accessible rooms equal to 1% of total room capacity, at least one, in facilities with 80 rooms or more and in four- and five-star hotels and holiday villages. The regulation is a ministerial instrument; the decree is the separate instrument that amended it. Read the consolidated version on mevzuat.gov.tr, and confirm the current text and your own case with a legal adviser before drawing.
- In those same facilities, the same article requires the entrance, the lifts, the general toilets and at least one food-and-beverage unit to be arranged for accessibility and marked with special signs; these duties are not proportional to the room count.
- The tourism regulation prints no door width and no bathroom size: it leaves the principles to Ministry communiqués (Article 44(1)(ğ)), while the Planned Areas Zoning Regulation ties buildings and entrances to the TS 9111 standard (Article 30(9)).
- The zoning regulation caps ramp slopes at 1:12 for a rise up to 15 cm, 1:14 for 16 to 50 cm, 1:16 for 51 to 100 cm and 1:20 above 100 cm, with continuous handrails of 32 to 45 mm at 0.90 m and 0.70 m.
- The text gives no rounding rule for the 1%, so a hotel that lands on a fraction should round up, write the calculation into the project file and confirm the reading with the Ministry before drawing.
In Türkiye, the tourism facilities regulation requires accessible rooms equal to 1% of total room capacity, at least one, in facilities of 80 rooms or more and in four- and five-star hotels and holiday villages, plus accessible entrances, lifts, general toilets and one food-and-beverage unit. Room and bathroom dimensions are not printed in that regulation; the building rules come from the zoning regulation and TS 9111.
A 40-room four-star hotel and a 400-room resort are both caught by the same sentence, and they owe very different things. A CAD file or a paper quoting a repealed text is not a source, so the first job is to find out which text is actually in force. After reading this article you will know how many accessible rooms your facility owes, which measurements are printed in law and which are not, and what to walk and photograph before an inspection.
Which texts actually govern an accessible hotel room in Türkiye?
Three layers apply, and they do different jobs: the tourism facilities regulation sets what a certified facility owes and how many rooms, the communiqués it points to hold the detail, and the zoning regulation with TS 9111 governs the building itself.
The tourism side is the Regulation on the Qualifications of Tourism Facilities (opens in a new tab), Presidential Decision No. 1134, Official Gazette 1 June 2019, No. 30791, consolidated on mevzuat.gov.tr (2026). Article 18(1)(b) creates the duty and the signage rule; Article 44(1)(ğ) hands the detailed principles for persons with physical disabilities to communiqués the Ministry prepares and publishes in the Official Gazette.
The building side is the Planned Areas Zoning Regulation (opens in a new tab), Official Gazette 3 July 2017, No. 30113, consolidated with amendments up to 1 July 2026. Article 30(9) and (10) require buildings and their entrances to comply with TS 9111, the Turkish accessibility standard, and Article 5(22) says doors, corridors, lifts, stairs and ramps must not fall below the regulation's own dimensions.
The two regimes have different triggers. The tourism regulation follows the certificate; the zoning regulation follows the building permit. A renovation can put you under both at once.
Do not cite a number you cannot trace. Read the consolidated text and the current communiqué, not a summary, a CAD block or a lecture slide. A figure that happens to be right is still unusable if the text behind it has been repealed. Ask your architect which revision of TS 9111 the project is drawn to, and keep that answer in the file: the standard is revised, and a detail copied from an older project may not match the copy your inspector holds.
NoteThe four texts to hold before drawing
Keep these in one file: the tourism facilities regulation (Decision 1134, 1 June 2019, No. 30791; Articles 18(1)(b) and 44(1)(ğ)); the Ministry communiqué it delegates to under Article 44(1)(ğ), as published in the Official Gazette; the Planned Areas Zoning Regulation (3 July 2017, No. 30113, consolidated to 1 July 2026; Articles 5(22) and 30); and the current edition of TS 9111. All are read on mevzuat.gov.tr or obtained through TSE.
How the certificate itself is granted, and how the class on it is set, is a separate process: see how hotel stars and facility classes are set in Türkiye.
How many accessible rooms does a hotel need?
Rooms equal to 1% of total room capacity, with a floor of one room, in facilities with 80 rooms or more and in four- and five-star hotels and holiday villages. The two triggers are separate, so a small four-star is caught even with 40 rooms.
Read the sentence as two triggers, not one. The first is size: a total capacity of 80 rooms or more. The second is class: four- and five-star hotels and holiday villages, at any size. A facility that meets either one owes the arrangements. Capacity here is counted in rooms, not beds: take the total room count on the certificate, multiply by 0.01, and apply the at-least-one floor.
For example, clearly hypothetical: 80 rooms gives 0.8, so one room; 150 rooms gives 1.5; 400 rooms gives four. The 1% is a minimum, not a target, and a hotel may build more.
The text states no rounding rule for a fraction. Rounding up is the prudent reading, but write the calculation down and confirm it with the Ministry before the drawings are fixed. The natural reading is that the accessible rooms sit inside the total room capacity, not on top of it; if your project depends on the other reading, get it confirmed in writing.
| Facility type | Does the 1% room rule apply? | Rooms required |
|---|---|---|
| Four- or five-star hotel, any size | Yes | 1% of total rooms, at least one |
| Holiday village, any size | Yes | 1% of total rooms, at least one |
| Other certified facility, 80 rooms or more | Yes | 1% of total rooms, at least one |
| Other certified facility, under 80 rooms | Not under this article | Check the type's own minimum requirements and the zoning rules |
| Day-use facility, rest stop, entertainment centre | No | Own type's minimum requirements |
Day-use facilities, rest stops and entertainment centres are not judged by the 1% rule; they make the arrangements set in their own type's minimum requirements.
What else in the building has to be accessible?
The facility entrance, the lifts, the general toilets and at least one food-and-beverage unit, and the arrangements must be marked with special signs. These duties do not scale with the room count.
A 90-room hotel with one accessible room still owes an accessible route from the door to that room, an accessible general toilet and one accessible food-and-beverage unit. The room is one item on the list, not the whole list. "General toilets" means the shared ones in public areas, not the bathroom inside the accessible room; guests who are not staying in that room use them too.
The entrance duty covers the approach: the drop-off point, the step at the door, the surface between the two. Signage is a duty in its own right under Article 18(1)(b): a correct room that nobody can find from the lobby has not been delivered. Check the route, not just the room. An accessible room at the far end of the furthest corridor, past a fire door with a raised threshold, is technically counted and practically useless.
ChecklistWalk and photograph these before an inspection
- The drop-off point and the path to the main entrance
- The entrance threshold and any ramp
- The lift, including whether it stops level with the floor
- The general toilets in public areas
- At least one food-and-beverage unit, including table spacing
- The signs marking each of these
- The route from the accessible room to the lobby and to the fire exit
What measurements do the texts actually give?
For the room and the bathroom, the tourism regulation gives none: it delegates the principles to Ministry communiqués. The hard numbers that are printed concern ramps, handrails and the entrance approach, and they sit in the zoning regulation.
Ramp slopes are graded by rise: at most 1:12 (8%) up to 15 cm, 1:14 (7%) for 16 to 50 cm, 1:16 (6%) for 51 to 100 cm, and 1:20 (5%) above 100 cm. A single long ramp at one gradient is not what the text describes. Ramps and intermediate landings need continuous handrails of 32 to 45 mm diameter at 0.90 m and 0.70 m: two heights, both continuous, including around the landings.
At the building entrance the regulation offers three routes: a ramp reaching up to the plot boundary in the front garden, or space for a disabled-access lift beside the stairs with a narrow side of at least 0.90 m and an area of at least 1.20 m², or a mechanical lifting platform. Floor coverings must be non-slip and must not hinder wheelchair or crutch movement; deep pile carpet in a lobby is a measurement problem, not a taste problem.
| Element | Requirement | Source |
|---|---|---|
| Ramp slope, rise up to 15 cm | At most 1:12 (8%) | Zoning Reg. Art. 30(12) |
| Ramp slope, rise 16 to 50 cm | At most 1:14 (7%) | Zoning Reg. Art. 30(12) |
| Ramp slope, rise 51 to 100 cm | At most 1:16 (6%) | Zoning Reg. Art. 30(12) |
| Ramp slope, rise above 100 cm | At most 1:20 (5%) | Zoning Reg. Art. 30(12) |
| Handrails on ramps and landings | Continuous, 32 to 45 mm, at 0.90 m and 0.70 m | Zoning Reg. Art. 30(13) |
| Building entrance | Ramp to plot boundary, or lift space beside stairs (narrow side at least 0.90 m, area at least 1.20 m²), or mechanical lifting platform | Zoning Reg. Art. 30(11) |
| Floor covering | Non-slip, must not hinder wheelchair or crutch movement | Zoning Reg. Art. 30(8) |
| Doors, corridors, lifts, stairs | To accessibility standards, not below the regulation's dimensions | Zoning Reg. Art. 5(22) |
| Room and bathroom dimensions | Not printed in the tourism regulation; delegated to Ministry communiqués | Tourism Reg. Art. 44(1)(ğ) |
For the room and bathroom, the answer is to obtain the current Ministry communiqué and the current TS 9111 edition, and to have the architect mark up the plan against them. Confirm the reading with the Ministry or your inspector before construction.
What changes in an old building or a renovation?
The tourism duty follows the certificate and the building duty follows the permit, so a renovation is where the two meet and where most projects lose time. The count can change without a single new room being built.
Crossing 80 rooms brings a facility under the room rule. A hotel that adds a floor, absorbs a neighbouring block or converts staff space into rooms should recalculate the 1% at the same moment. Converting two standard rooms into one accessible room costs inventory and usually plumbing, so plan the stack early: a room above the boiler room or half a level down a corridor is hard to make work.
Where the site cannot take a ramp at the required gradient, the zoning regulation's other entrance options, the lift space beside the stairs or a mechanical lifting platform, are the routes to examine with the architect. A lift that stops half a floor from the landing does not produce an accessible route; check the levels, not just the presence of a lift.
Keep the calculation and the measured drawings in the project file: total rooms, the 1% figure, the room numbers, the route, the accessible toilet and the food-and-beverage unit. An inspector who can follow the reasoning spends less time on site. Ask the Ministry or the inspector before the drawings are frozen: rebuilding a bathroom after a site visit costs far more than a letter. If a new certificate is part of the project, the sequence is covered in applying for a tourism operation certificate step by step.
Watch outDo not reuse a detail from an older project
The tourism regulation delegates room principles to communiqués and the zoning regulation points to TS 9111, and both change. A detail that passed in an earlier project, or a downloaded CAD block, may not match the text your inspector is reading today.
From a compliant room to a room a guest can use
Compliance is a count and a set of measurements; usability is what happens when a guest arrives. The two overlap, but the second needs decisions the regulation does not make for you.
The inspector checks the count, the signs and the presence of the arrangements. The architect has to prove the measurements against TS 9111 and the zoning regulation. Neither of them checks whether the bed height, the reach to the bedside socket or the turning space in the bathroom actually work. Walk the room in a wheelchair, or ask someone who uses one to walk it with you: a bathroom door that opens inward into a small room can be compliant on paper and unusable in practice.
Train the front desk on the room, not just on the code: which room it is, what is in it, and what to do when a guest asks for a different bed configuration. The service side, arrival, breakfast, evacuation and communication, is a separate checklist and worth doing once, properly, rather than room by room; the accessible hotel checklist: rooms, routes and service covers it. Older guests who are not disabled often need the same things, a step-free route, a grab rail, a chair in the shower, as the checklist for older guests in hotel rooms and routes sets out. The same investment serves both groups.
TipKeep a one-page room sheet
List the measurements, the route from the lobby, the nearest accessible toilet and the evacuation plan, and give it to the front desk and housekeeping. It turns a certificate item into something a shift can act on at 2 a.m.
What to do next
Pull the consolidated tourism facilities regulation and the current Ministry communiqué, count your rooms, and write the 1% calculation and the measured route into one page before you call the architect. The count tells you what you owe; the measurements tell you whether the building can deliver it; only the walk-through tells you whether a guest can use it.
Frequently asked questions
What door width must an accessible hotel room have in Türkiye?
The tourism facilities regulation prints no door width for the room; it delegates the principles to Ministry communiqués (Article 44(1)(ğ)). The zoning regulation requires doors, corridors and lifts to be arranged to accessibility standards and not below its own dimensions (Article 5(22)), and ties buildings to TS 9111. Obtain the current communiqué and the current standard, and confirm with the inspector; a width taken from a CAD file is not a citation.
Does a 40-room four-star hotel need an accessible room?
Yes. The accessible hotel room requirements in Türkiye have two separate triggers: a total capacity of 80 rooms or more, and four- and five-star hotels and holiday villages at any size. A four-star with 40 rooms meets the second. One percent of 40 is 0.4, and the text sets a floor of at least one room.
How do you round 1% when it lands on a fraction?
The regulation states no rounding rule. Rounding up is the prudent reading and the one an inspector is likely to expect, but the hotel should write the calculation down and confirm it with the Ministry before the drawings are fixed. A 150-room hotel should plan for two rooms, not one and a half.
Do day-use facilities and rest stops follow the same 1% rule?
No. Day-use facilities, rest stops and entertainment centres make the arrangements set in their own type's minimum requirements rather than the 1% room rule. The general building duties under the zoning regulation still apply to the structure.
Sources
- Turizm Tesislerinin Niteliklerine İlişkin Yönetmelik (Cumhurbaşkanı Kararı No. 1134), consolidated text (opens in a new tab)T.C. Cumhurbaşkanlığı Mevzuat Bilgi Sistemi (mevzuat.gov.tr)mevzuat.gov.tr
- Planlı Alanlar İmar Yönetmeliği (consolidated text), Articles 5 and 30 (opens in a new tab)Presidency of the Republic of Türkiye, Legislation Information System (mevzuat.gov.tr)mevzuat.gov.tr