Compliance in Türkiye

Tiny houses and caravans as lodging: the mobile home facility type in Türkiye

Understand the legal definition of a mobile home facility in Türkiye. This guide explains unit limits, land requirements, and certificate rules to help you verify a deal before investing.

  • 9 min read
  • AI Otel Editorial

AI draft · awaiting editorial review

Contents

Key takeaways

  1. The current Regulation on the Qualifications of Tourism Facilities defines a mobile home as a vehicle with O2-class type approval, towed by a motor vehicle and subject to Highway Traffic Law No. 2918.
  2. The same regulation allows 5 to 49 lodging units, each inside an area of at least 250 square metres, on land zoned for kamping or rural and eco tourism.
  3. The regulation excludes mobile homes from tourism investment certificates, so the only route is a tourism operation certificate applied for after the site is ready.
  4. Nothing may be done that removes the units' ability to move, and no meeting hall or multi-purpose hall may be built; food and drink outlets together may seat at most 100 people.
  5. A tiny house fixed on foundations is a building, not a mobile home, and falls under a different set of permissions.
  6. Confirm the current wording, amendment dates and your own case in the official consolidated text on mevzuat.gov.tr, and with an accountant or legal adviser.

In Türkiye a mobile home (mobil ev) is a towed vehicle with O2-class type approval, arranged as a lodging unit. A mobile home facility needs 5 to 49 such units on land zoned for camping or rural and eco tourism, at least 250 square metres per unit, valid technical inspections, and no investment certificate is issued for it.

A buyer finds a plot, orders ten tiny houses and only then reads the definition. The units are not vehicles, the land is not zoned for camping, and the project has no certificate route. The regulation is short, and it decides the purchase before the purchase decides anything. This article walks through the licensing rules for a mobile home (tiny house and caravan) site in Türkiye, so you can test a deal against the actual text before you pay a deposit.

What counts as a mobile home under Turkish tourism rules?

A mobile home is a vehicle, not a building. Article 4(1)(t) of the Regulation on the Qualifications of Tourism Facilities defines it by four conditions that must all hold at once, according to the consolidated text on the Presidency's legislation system (mevzuat.gov.tr) (opens in a new tab).

The unit holds an O2-class type approval certificate under the relevant legislation. Type approval is issued for a design, so the seller must be able to show the document for the model you are buying. The unit is designed to be towed by a motor vehicle; it is not a structure that happens to arrive on a truck. It is arranged as a lodging unit, with a living area, a bed and a bathroom-toilet inside. And it is subject to Highway Traffic Law No. 2918 of 13 October 1983, which means registration and periodic technical inspection follow the unit for as long as it is in service.

The definition entered the regulation through Presidential Decision No. 8112 (Resmî Gazete 18 January 2024, No. 32433). The facility article that goes with it was amended again on 29 August 2024 by Decision No. 8864, so work from the consolidated text in force today, not from a January 2024 news summary.

The definition says nothing about cabins, containers on foundations, bungalows or treehouses. Those are separate questions, and the name on the sales page does not settle them.

NoteWhat O2 means in plain words

O2 is a trailer weight class in the vehicle type-approval system. The certificate is issued for the design of the unit, not for each individual unit, and it is the first document to ask a seller for.

What does a mobile home facility need? Units, land and layout

Article 35/A sets the site: 5 to 49 mobile homes on land zoned for camping or rural and eco tourism, at least 250 square metres per unit, with a fenced, lit site and a reception unit at the entrance.

The facility may not sit on allocated public land. The investor needs land it holds, in an area the zoning plan reserves for kamping or rural and eco tourism use. The facility consists entirely of mobile homes, and the count runs from 5 to 49 lodging units: below five it is not this facility type, and above 49 it does not fit the article.

Units are spread out, and each one sits inside an area of at least 250 square metres. The site is separated by fences, walls or greenery and is lit. At the entrance there is parking for one vehicle per unit and a reception and administration unit. A sketch showing the site layout goes into the application file, so the plan is a document the Ministry reads, not an internal drawing.

Each unit is set up for two people and gets natural light. Inside: a bed, one pillow per person, a pillowcase, a sheet, a light blanket or quilt suited to the climate, a safe, a minibar, hot-drink equipment and the listed bathroom items. The registration certificates of all units must be in the name of the owner, the certificate holder or the operator. A site where the units are registered to a third party does not fit.

RequirementWhat the rule saysWhat to check before signing
Unit count5 to 49, all mobile homesCount matches the plan
Land statusNot allocated public landTitle deed in your control
ZoningKamping or rural and eco tourismZoning plan for the parcel
DensityAt least 250 m² per unitDivide plot area by unit count
Site edgeFence, wall or greenery, litBudget for the perimeter
Entrance1 parking space per unit, reception unitSpace on the sketch
Unit fit-outTwo people, bed, linen, safe, minibarSupplier's fit-out list
RegistrationIn the name of owner, holder or operatorRegistration certificates
Layout documentSite sketch in the fileSketch matches the site

Which tourism certificate can a mobile home facility get?

Only a tourism operation certificate. Article 6(2) of the regulation excludes mobile homes from tourism investment certificates, so there is no investment stage to hold while you build.

The practical consequence is order of work: the site and the units are ready first, and the operation certificate is applied for afterwards. The opening period of up to two years that the Ministry sets for investment-certified facilities does not apply here, because there is no investment certificate to attach it to. If you are weighing the two routes, tourism certificate types in Türkiye are worth reading before you choose a facility type.

The application presents the registration certificate of every unit, and each unit must hold a valid technical inspection under Law No. 2918 on the application date. The duty does not end at the certificate: valid inspection certificates must keep being presented to the Ministry after the operation certificate is issued, so the inspection calendar becomes a permanent part of running the site.

The Ministry of Culture and Tourism issues the certificate. The application file, the current forms and any local requirements should be confirmed with the Ministry and your adviser before you commit to a purchase, since procedures change and this article describes the duty in general terms only. A tourism operation certificate is one document in a sequence, and the order of permits when opening a lodging business is worth mapping before the first payment, because the certificate type you can hold decides what you may build and when.

What the rules forbid: fixed units, meeting halls and large restaurants

The article protects two things: the unit's ability to move, and the site's character as lodging rather than an events venue. One sentence does most of that work.

Nothing may be done that removes the units' ability to move. Decking, foundations, permanent utility connections and built-on extensions all raise the same question, and the answer belongs to the Ministry and your adviser, not to a supplier. No meeting hall or multi-purpose hall may be built on the site, so weddings, conferences and large group events have no room in this facility type.

A restaurant, café, bar or breakfast hall may together serve at most 100 people, and may not sit inside the total area occupied by the units. Food and drink is an add-on to the lodging, not a second business on the same land. The facility may not be on allocated public land, which removes the coastal and forest allocation route from this type entirely.

Article 35/A was amended on 29 August 2024 by Decision No. 8864. Read the consolidated text in force, because a summary written in early 2024 may describe a version of the article that no longer exists.

Watch outThe sentence that decides most projects

Nothing may be done that removes the units' ability to move. If the business plan depends on the units staying in one place permanently, the plan and the facility type are pulling in different directions, and that should be resolved before the land is bought.

Is a tiny house on foundations a mobile home?

No. Once a unit sits on foundations and is no longer a towed vehicle under traffic law, it is a building, and buildings are assessed under a different set of rules.

The test is the legal status of the object, not the name in the listing. A structure fixed to the ground is looked at as construction, with zoning, construction permission and municipal questions attached. That route also brings a municipal workplace licence, and a fixed structure also brings municipal permissions that sit outside the tourism certificate; confirm the split of authority with the municipality and your adviser. The certificate that fits the property then depends on what is actually built, and the range of certified accommodation types is wider than the mobile home article.

This article does not advise on arranging a unit so that it keeps a vehicle classification while being used in a fixed way. That question should go to the Ministry and your legal adviser in writing, before a purchase, with the site plan attached.

The useful habit is to ask two questions about any unit: what type approval does it carry, and what will the site plan show it standing on. If the two answers point in different directions, stop.

A test to run before you buy units

Run the regulation against the deal in this order, and stop at the first item you cannot answer with a document. Each check is cheaper before the deposit than after it.

ChecklistBefore signing anything, gather the following

  • The O2-class type approval certificate of the model, read rather than accepted as a photograph of a brochure
  • Confirmation that the unit is designed to be towed and contains a living area, a bed and a bathroom-toilet
  • Title deed and zoning plan showing the parcel is yours to use and reserved for kamping or rural and eco tourism, and not allocated public land
  • A calculation dividing the usable plot by the planned unit count, showing at least 250 square metres per unit at 5 to 49 units, plus entrance parking and a reception unit
  • Registration certificates that can stand in the name of the owner, the certificate holder or the operator
  • Technical inspections that can be kept valid at application and afterwards, with renewal dates in the operating calendar
  • A site plan free of meeting halls, within the 100-person food and drink limit and outside the units' total area, and with nothing that removes the units' ability to move
  • Ministry and adviser confirmation of the file against the consolidated regulation text in force today

What to do next

Put the type approval documents and the zoning plan side by side before you pay for a single unit. The regulation is short and it decides the deal early: a vehicle definition, a land rule, a density rule and a mobility sentence. Then confirm the file with the Ministry of Culture and Tourism and your own adviser, because the article was added in January 2024 and amended in August 2024, and the consolidated text is the version that counts.

Frequently asked questions

How many mobile homes can a mobile home facility have in Türkiye?

Between 5 and 49 lodging units, all of them mobile homes, each inside an area of at least 250 square metres. Fewer than five does not meet the facility definition in Article 35/A of Regulation 1134.

Can I get a tourism investment certificate for a mobile home facility?

No. Article 6(2) of the regulation excludes mobile homes from investment certificates, together with special facilities, gastronomy facilities, apart hotels and pensions. The route is a tourism operation certificate, applied for once the site and units are ready.

Does a tiny house need a tourism certificate in Türkiye?

It depends on what the object legally is. If it is a towed vehicle with O2-class type approval under Highway Traffic Law No. 2918, it can sit in a mobile home facility. If it is fixed on foundations it is a building, and construction, zoning and municipal permissions apply. Confirm the specific case with the Ministry and a legal adviser.

Do the units need periodic technical inspection?

Yes. A valid inspection under Law No. 2918 is required on the date of the operation certificate application, and valid inspection certificates must keep being presented to the Ministry after the certificate is issued.

How much land does a caravan or tiny house site need?

At least 250 square metres per unit, plus a fenced and lit site edge, parking for one vehicle per unit at the entrance and a reception and administration unit. The zoning plan must reserve the area for kamping or rural and eco tourism, and the land may not be allocated public land.

Sources

  1. Turizm Tesislerinin Niteliklerine İlişkin Yönetmelik (consolidated text), Article 6 (opens in a new tab)T.C. Cumhurbaşkanlığı Mevzuat Bilgi Sistemi (mevzuat.gov.tr)mevzuat.gov.tr

AI Otel EditorialEditorial team

Drafted with AI assistance from AI Otel’s published fact base. Not yet reviewed by an editor.

We can brief you on this topic.

If this topic touches your work, we can walk you through what is built and what is designed.

Request a briefing